ABV Rock (Executing by EGG Sister Company)
General Foreman from 2th Feb 2016-till now
Responsibilities:
Managing and Arranging the logistic work in the site like follow up the equipment’s need it in the site, provide the labors all tools required to complete the work.
Managing labors team and solving any issues or problems related to them
Follow up Carpentry and Steel work
Follow up site infrastructure like Mechanic Manholes (Drainage) and electrical Manholes.
Follow up the construction of bricks and plaster and all the work of the tiles and the work of insulation ceilings and walls
Follow up for ceiling and pavement paint works
Project:
Customs Housing Haditha Port
Location: Haditha-Qurryat
Saudi Binladin Group
Finishing Foreman from 16th Aug 2009- 01/02/2016
Location: Riyadh
Project:
King Saud University for Girls from 16th Aug 2009 – Jun 2013
King Abdullah Financial District from July 2013 – Feb 2016
Responsibilities:
a. Leadership and Supervision
Communicating the job to and with the crew
Assigning crew tasks
Recognizing, addressing and resolving issues/problems among/between crew members
Maintaining work standards and outlining behavioral expectations to ensure crew morale and productivity
Applying the principles of workplace respect on site
Ensuring crew compliance with project policies and procedures
Arrange work sequence to open up works for all subcontractors
Communicate site engineer / project manager if any difficulties / hurdles came which hinders the progress
Ensure any manpower don’t sits without works
Motivate crew members to take preventive actions for safety matters
b. Technical
• Finishing
Marble installation for surfaces as per given plans.
Porcelain, Ceramic and Granite installation for walls and surfaces.as per given plans and layout.
Mosaic (Glass and Ceramic) installation.
Utilizing all types of painting materials such as varnish, lacquer, shellac, enamel, latex, epoxy, water-proofing and heat resistant finishes for surfaces, buildings, and fixtures
Graffiti response and removal using a variety of available products and soda blasting.
Operates, cleans and maintains all painting equipment, including brush, roll, sprayers and electrostatic sprayers, pumps, etc. Safely stores and labels all materials.
• Precast
Precast managing tasks including transportation and erection of precast, form and pouring precast on site.
Measure distances, direct gates setting and block outs as required by layout and plans